Bridge Construction

Current Projects

Roadworks, Stormwater Drainage, Water & Sewerage Reticulation, Hill End Road Reconstruction, Mackay                                                                                                                                        

Staged road reconstruction under traffic of Glenella Road & Hill End Road, Mackay. Construction involves demolition, excavation, in-situ sub-grade stabilisation, retaining walls, stormwater drainage works, water and sewerage reticulation, concrete driveways and footpaths, asphalt surfacing and miscellaneous works.
Length: Approx. 800 metres
Client: Mackay Regional Council
Approx. Value: $3.54m

Design and Construction of Pedestrian Bridge, Bundilla Boulevard, Mountain Creek

Bridge Type: Design and construction of a 3 span Pedestrian Bridge over Mountain Creek including 40m of approach footpaths. Construction involved supply and installation of steel lined bored piles, pier and abutment insitu concrete headstocks, precast deck units, insitu concrete slab and steel balustrades.
Length: 3 spans ( 2 at 18.5m and 1 at 30m )
Pile Type: Steel Lined bored piles
Number/Size of Pile: 4 no 1200mm diameter at average 26m deep
Client: Stockland
Approx. Value: $1.1m