Roadworks & Earthworks
ROADWORKS, STORMWATER DRAINAGE, WATER & SEWERAGE RETICULATION, HILL END ROAD RECONSTRUCTION, MACKAY
DESCRIPTION: Staged road reconstruction under traffic of Glenella Road & Hill End Road, Mackay. Construction involves demolition, excavation, in-situ sub-grade stabilisation, retaining walls, stormwater drainage works, water and sewerage reticulation, concrete driveways and footpaths, asphalt surfacing and miscellaneous works.
LENGTH: Approx. 800 metres
CLIENT: Mackay Regional Council
APPROX VALUE: $3.54m
TEVOIT RD, NORTH MACLEAN
DESCRIPTION: Teviot Road, South of Hives Road to south of Olsen Road, North Maclean. Intersection upgrade, road widening and drainage structures.
CLIENT: Logan City Council
APPROX VALUE: $850k
DAWSON HIGHWAY (ROLLESTON – SPRINGSURE)
DESCRIPTION: The project required us to widen existing sealed road to provide 2/3.5m traffic lanes on a 9.6m fully sealed formation. Works include demolition/removals, earthworks, culvert construction (precast units plus insitu concrete), road pavement construction, bitumen surfacing and installation of signage and guide posts for the Main Roads Department.
CLIENT: QLD Department of Main Roads
APPROX VALUE: $2.75m
BRUCE HIGHWAY (GYMPIE – MARLBOROUGH), TWO MILE SCHOOL
DESCRIPTION: Construction of pavement widening and intersection works from Pinewood Avenue to Two Mile State School, including school car park area.
CLIENT: QLD Department of Main Roads
APPROX VALUE: $1.5m
WARREGO HIGHWAY (ROMA – MITCHELL)
DESCRIPTION: Pavement Stabilisation and bitumen surfacing 9.34km of existing pavement in sections over a length of 32.51 klms.
CLIENT: QLD Department of Main Roads (South Western District)
APPROX VALUE: $900k
BRUCE HIGHWAY (GIN GIN – BERNARABY)
DESCRIPTION: Construction of 1.5km of new road realignment together with works under traffic including reinforced concrete boxed structures and associated drainage.
CLIENT: QLD Department of Main Roads (North Rockhampton)
APPROX VALUE: $1m
KESTREL BALLOON LOOP
DESCRIPTION: Construction of approx. 5k of railway formation including the manufacture of Top 600 material and installation of 3 major drainage structures. Earthworks include approx. 126,000 cut to fill together with 30,000 m3 of Top 600 material.
CLIENT: Queensland Rail
APPROX VALUE: $2.5m